Meeting of Board of Director
Design and setup the system for RCC construction
Here we have included problem and their possible solution.
A meeting of the steel contraction that can be held between their organization to improve their productivity that are as below,
Agenda
Find out the manpower requirement as compared
with existing setup.
ü
To recruit a design Engineer.
ü
Foreman for both pre-fabrication and Erection.
Strengthening factory setup for increasing
production and quality of workmanship.
ü
Some Portion of the factory floor space should
C.C construction for improving.
ü
Introduce spray gun for priming of the
I-Section.Design and setup the system for RCC construction
Outsource new sub contractor for both prefabrication
steel and RCC construction.
ü
Enlisted new prefab. Subcontractor
ü
Enlisted new RCC Subcontractor.
ü
Outsourcing for prefabrication site
Extra Preparation should adopt for upcoming TM
projects and New Client.
ü
Feasibility study JV should check for the
construction / approach with another company for upcoming TM projects.
Justification of active participation in the
company directors in the company in enhancing management activity.
ü
Management will highly encourage if any one or
more shareholder is agreed to active participation in the company.
Here we have included problem and their possible solution.